No, there is no mess; we give a V.I.P service to all our clients
Do you have insurance? £2 000 000 public liability
How long does a Power Flush take? We generally start at about 8:30 am and depending on the size of the system and degree of the problem, the Power Flush will be finished between 2-8 pm
Do you take of each radiator and individually Power Flush them? No. It is not usual to take radiators off as the Power Flush machine flushes all the radiators from one point on the system.
Can Power Flushing cause leaking? No. Only if there is a pre-existing problem
Are your operatives fully qualified? Yes. All operatives are fully trained in Power flushing